Hydrogen Generation System


  • Installed Korea’s first water electrolysis hydrogen production facility in compliance with the Hydrogen Act
  • Applied water electrolysis system design technologies capable of responding to load fluctuations
  • Implemented core technologies to ensure high stability of water electrolysis systems

Equipment Configuration

SYSTEM major performance

Year

Site

Power(kW)

Installed Capacity
(kg-H2/day)

Remark

2025~

Miryang Small Hydropower

1,000

314

PEM

2025~

KIST

160

50

SEOC BOP Installed

2024

Seongnam Water Treatment Plant

600

188

AWE

2023

Donghae City

100

31

AWE

installation cases

Donghae City

Seongnam Water Treatment Plant

KIST