
BUSINESS INTRODUCTION
Industrial Plant
Industrial Plant
Plant construction
Accumulated Expertise : Extensive know-how built through a wide range of project experience from design to construction, supported by a team of highly specialized engineers.
Proven Track Record : Strong experience in executing overseas projects across China, North America, and Eastern Europe, delivering optimized, cost-effective technologies and performing integrated turnkey projects both domestically and internationally.
Integrated Control & IT Solutions : Ensuring high reliability by combining advanced control technology with IT to provide data management for production processes and integrated wired and wireless solutions.

key areas

Patented Technologies: Smart powder conveying systems and precision dosing

Auto Pigging Conveying System

Smart Process Control Technology

Raw Material Temperature Control Technology

Yield Improvement Technology

Dust Prevention Technology

Application cases

Secondary Battery Cathode Process

Ashless Coal Production System

Artificial Marble Raw Material Manufacturing Process

Electrolyte Manufacturing Process

Powder Detergent Manufacturing Process

Liquid Detergent & Shampoo Manufacturing Process
SYSTEM performance
Construction Areas
Location
Type
Year
Secondary Battery Raw Material Room
Overseas(U.S.)
Installation of one small-sized 46XX line
2025~2026
Secondary Battery Raw Material Room
Overseas(U.S.)
Installation of one small-sized 46XX line
2024~2025
Secondary Battery Raw Material Room
Domestic
Automotive ML line
2023~2025
Secondary Battery Raw Material Room
Domestic
7 small battery lines
2001~2021
Secondary Battery Raw Material Room
Domestic
4 automotive battery lines
2010~2012
Secondary Battery Raw Material Room
Overseas(China)
9 small battery lines
2015~2020
Secondary Battery Raw Material Room
Overseas(China)
2 automotive battery lines
2019~2020
Secondary Battery Cathode Material
Domestic
Cathode material production line with a capacity of 18,000 tons
2022
Secondary Battery Cathode Material
Domestic
12 cathode material production units
2007~2018
Secondary Battery Electrolyte
Domestic
8 dissolvers at electrolyte production plant
2010
Secondary Battery Electrolyte
Domestic
4 dissolvers at electrolyte production plant
2006
Precursor
Domestic
Precursor (Reactor)
2012
Precursor
Domestic
Precursor Pilot (Reactor)
2011
Precursor
Domestic
Precursor Pilot (Reactor)
2009
Precursor
Domestic
Precursor Pilot (Reactor)
2008
Secondary Battery Separator Coating Raw Material Room
Domestic
3 Separator Raw Material Lines
2012


![[56th Trade Day] USD 100 Million Export Tower Award – Techwin | CEO Bung-Ik Jung](https://en.techwin.co.kr/wp-content/uploads/2025/10/16894946972839.jpg)
